| Step | Annual Maintenance Activity |
| 5-2 | Clean and polish clear window surfaces with appropriate care for minimizing damage |
| 5-3 | Check ailerons for loose hinge linkages (up and down movement) |
| 5-4 | Check pitot tube condition and hose connections |
| 5-5 | Check instrument panel connections and instrument condition |
| 5-6 | Check control stick "play" and “dead zone” |
| 5-7 | Check for control cable condition and corrosion – along full length; check linkages/safety wiring |
| Part 6 | Reassembly and Final Inspection |
| 6-1 | Inspect battery replacement schedule on ELT; check operation |
| 6-2 |
Reinstall
floorboard, interior panels, seats, seat belts, ELT, aileron fairing covers
|
| 6-3 | Reinstall inspection covers and inspection fairings |
| 6-4 | Final inspection |
| 6-5 | Logbook entry by A&P/IA Conducting Inspection |